Tuesday, 8 November 2011

Progress Report

So far we have found the planning and filming challenging yet rewarding. It is not particularly easy although it is very rewarding watching it come together. We have also found that not everything goes smoothly. In the storyboarding process we drew up a lot of scenes that weren’t possible to do on the day of filming. For example we wanted a shot of a foot stepping in a puddle and words appearing when the foot had left but when we went out to film we could not find any puddles so we instead used the frame in the story board to show that the character is travelling somewhere on foot.
  After the half term we came back and started the sound track and editing process. I used garage band to make the intro song using knowledge I gained from music GCSE and was able to create a song without using any loops. When the song was finished we started to try and make the song fit with the shots that we had taken. We edited the credits and the visual aspects at the same time as we wanted to intersperse the credits with the shots, also some of the shots needed titles that were relevant to the pictures. We also needed to order the credits that were edited in with the credits that were written on the props of the film. 

No comments:

Post a Comment

 
© 2009 12T1-41 CHILDRENS FILM 2011. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz